News   Jul 05, 2024
 913     0 
News   Jul 05, 2024
 1.1K     12 
News   Jul 05, 2024
 520     0 

Search results

  1. V

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    The windows still looked pretty new
  2. V

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    at least not a copy of E8/ phase 1
  3. V

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    really looking forward to seeing the redesigned E15 / phase 2
  4. V

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    The North Tower had the Red strip pool in the very initial proposal but had been taken away after.
  5. V

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    I think that's for the e8 ( phase 1 ) building under construction which will keep the red stripe pool, but how about the e15 slim one? Didn't hear any update at all for many months:confused:
  6. V

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    well with the added width i wish they could bring back the red strip pool to the building from the original concept
  7. V

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    Hi, I'm new here, just wondering if anyone get any info / update about the sales for the econdos Phase 2 ? Is it done already or not even started yet ? Didn't hear anything from Bazis since last summer after they had announced the phase 2 project. thx

Back
Top