IMO the 402 and 403 should be signed as one continuous highway, with a concurrency with the 401 through London, Ingesoll, and Woodstock connecting them.
If it were up to me, the 402 would run from Sarnia to the Freeman Interchange in Burlington, and the Mississauga section of the 403 would be...