khaldoon
Active Member
Today
A load of cladding packages waiting to be installed.
Cladding on the south side of the 8th floor, lowest ceilings so far.
A load of cladding packages waiting to be installed.
Cladding on the south side of the 8th floor, lowest ceilings so far.