Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

Today:
DJI_0046.JPG
 
Photos taken today, Friday (Feb. 27), with an additional one taken yesterday from Woodbine Beach, the first photo below. Not sure if I have ever posted one from that vantage point before. Clouds have cleared since I posted last Friday, revealing that all the Rail Climbing Systems (RCSs) installing the skin are at level 80, with the west RCS now having risen to join the east and north ones. Seems to be as high as they can go, so perhaps we shall soon see them dismantled. Meanwhile, cladding is now partly installed as high as level 82, as visible on the south face.

UTIMG_9830.jpg
UTIMG_0756.jpg
UTIMG_0498.jpg
UTIMG_0556.jpg
UTIMG_0188.jpg
UTIMG_0224.jpg
UTIMG_0270.jpg
UTIMG_0299.jpg
UTIMG_0380.jpg
UTIMG_0695.jpg
UTIMG_0108.jpg
UTIMG_0071.jpg
UTIMG_0149.jpg
UTIMG_9999.jpg
UTIMG_9942.jpg
 

Back
Top