jer1961
Active Member
Photos taken today, Friday (Jan. 9). Another week where there is no visible progress compared to the week before, though one of the Rail Climbing Systems (RCSs) installing the skin has been removed. The RCS of the south face is now gone. (I don't think it climbed like the others, so, strictly speaking, it wasn't an RCS.) As yet, don't see any installed skin on the last section of floors near the top.
Lots of interesting light today, always seeing a new look for the tower depending on what the sky is doing, so a few shots of that!
www.flickr.com
www.flickr.com
Lots of interesting light today, always seeing a new look for the tower depending on what the sky is doing, so a few shots of that!
One Bloor West (The One) "time-lapse"
From October, 2020, as above-ground construction started in earnest at The One (1 Bloor W.) in Toronto. More or less a weekly photo usually taken on a Friday, with some gaps during early-on construction hiatuses. The initial photographs are from 2015, during demolition at the site, 2018, during...
One Bloor West (The One) construction
Photos of One Bloor West (The One) construction progress, including a "before" shot from 2011 and several from 2015 after the demolition of Stollery's. Notable for becoming Canada's first supertall building, i.e., over 300 metres (985 feet) tall. (The CN Tower does not fall under the definition...
