News   Feb 13, 2026
 2K     5 
News   Feb 13, 2026
 3.9K     1 
News   Feb 13, 2026
 4.8K     0 

Recent content by untitled space craft

  1. U

    RapidTO: Citywide Streetcar Priority (City of Toronto, TTC)

    I see. If that's the case, then I'm not sure if the intersection has green extensions or not. I'll update my original post to clarify.
  2. U

    RapidTO: Citywide Streetcar Priority (City of Toronto, TTC)

    I'm not sure about this. I wasn't timing the headway of streetcars, but some of them were definitely bunching. I was watching the pedestrian countdown, which always ended at the same time as the transit/car N-S green. If I understand correctly, a green extension would hold the transit/car N-S...
  3. U

    RapidTO: Citywide Streetcar Priority (City of Toronto, TTC)

    I was standing at Dundas and Spadina last night to check if the new TSP was active. The good news is that phase rotation is indeed live, and I saw 3 streetcars proceed through the north-south green, followed by a lagging left once the streetcars have passed. Hooray! However, the signals were...
  4. U

    Finch West Line 6 LRT

    The speed limit is 60km/h on both lines, as set by council: https://secure.toronto.ca/council/agenda-item.do?item=2021.IE23.17 https://secure.toronto.ca/council/agenda-item.do?item=2021.IE20.15 Not sure about the vehicle top speed.
  5. U

    Finch West Line 6 LRT

    At risk of belabouring this point, I took the line today and was not impressed with its speed (or rather, its lack thereof). I recorded my trips using a GPS app and it told me that my average speed from Finch West to Humber was 10.8 km/h (57 min), and my average speed on the return leg was 12.6...
  6. U

    North York At The Centre Secondary Plan

    Time to dust off this thread--the secondary plan is headed to Planning and Housing committee on December 3: https://secure.toronto.ca/council/agenda-item.do?item=2025.PH26.6 I've been skimming through the document and so far it seems that most of the big changes survived consultation. The...
  7. U

    Toronto Tyndale Green | 80.29m | 24s | Collecdev-Markee | KPMB

    Demo has started; pics from today
  8. U

    GO Transit: Construction Projects (Metrolinx, various)

    In my mind, putting the T on all forms of transit actually pollutes the meaning of the symbol. I want to know what type of transit I can expect to see at the stop. (Will it be a subway or a bus? How fast is it?) Transit mode factors into my decision on what types of trips I can make from that...
  9. U

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I found it hard to believe this claim given that CIBC square only opened in 2021! Haven't read the article (paywalled) but would be curious to know if they accounted for this.
  10. U

    Toronto East Harbour GO & Ontario Line Station | 14.35m | 1s | Metrolinx | HDR

    So.... to summarize: haphazardly placed metal fins, a dingy-looking underpass, and a comically large EAST HARBOUR sign. What a disappointment. As an aside, I found it really funny how they felt the need spam the platform canopies with "East Harbour." You'd think people have a wider field of...
  11. U

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    Looks like christmas-themed decor to me. A tree maybe? Gotta say, the wood and concrete pillars do not work well together. I didn't notice how bad the bare concrete was until the wood panels drew my eye to them.
  12. U

    Toronto 185 Cummer | 10.49m | 3s | City of Toronto | Montgomery Sisam

    Are you aware that Sean is an actual planner who appears as an expert witness at the OLT? I wouldn't exactly say he's ignorant of the OLT process.... I can't speak to the content of his tweets as I can't see them (Twitter is all scuffed; thanks elon) but to say that he's an "average listener"...
  13. U

    Toronto Tyndale Green | 80.29m | 24s | Collecdev-Markee | KPMB

    Hi all, long-time lurker here. I've been following this project for a while and thought I'd share some updates: New renders: (From Arch plans, dated Sep 18 ) Unit mix: units are now split 610 condos, 661 market rent, and 239 affordable rent. One of the things that stood out to be when this was...

Back
Top