Yup.
Winds started to pick up. Hard to keep the tagline taut. Derrick has a 30km/h maximum operating wind speed, pretty restrictive especially downtown with wind tunnel effects. With winds picking up again this week, outer 3 jib sections needed to be removed to reduce cantilever and stress on...
South crane (luffer) going up first. Couldn’t shut down Bathurst so forced to lift across the entire site to erect it. North crane will be a short jib flat-top.
It's to service smaller structure going in behind the old Bond St brick buildings. Tricky design, had to keep the crane jib below the SMH flight path, way from hospital tower, and away from the other crane.