The excavation is definitely not done yet. From that area they just opened up exposing the caissons still needs to go down a further 2 - 3 metres. That will be consistent through the site with some areas deeper still. A lot of dirt still to come out.
That building isn't moving. They are just supporting it and the dig will go on underneath it. The logical option would be to move it to the south corner but it's not happening.
The heritage building isn't moving. It will be supported on 4 structural caissons which are already in place. Next they have to tie it all together with more beams that will be slid into place through openings that they will be cutting out. Moving it to a corner would be ideal but its not what...
Unless you go by the site everyday, why would you make such a statement. The work hasn't stopped since the first day the equipment arrived on site. They are still in the shoring phase. Structural steel columns have been installed at either end of the yellow beam that will support the existing...
The East side still needs to be prepped (old foundations removed along Yonge) before any shoring work is done on that side. The prep work will only be done after the hoarding is moved to its permanent location. The hoarding will line up to the new walkway container that is already in place on...