Those were run by CN crews back in the day. Not sure if they recrewed in north bay or Huntsville though.
For the current train however the crewing logistics might be a nightmare as CN doesn't want to crew them(especially the passenger train) and ONR doesn't really have the manpower hence why...
Lol I doubt that. ONR has been trying to recruit CN guys to run the trains because they don't actually have the man power to run the trains but CN doesn't want to run them.
Yeah, that's just yard operations. They don't really have the road manpower to support it out of north bay yet. So I heard they were gonna just run it out of Engleheart to Toronto (both trains). CN doesn't want to run it anymore for some reason. I heard 9-12 jobs will be lost in the Toronto Terminal
Yeah ONR will create a crew base in North Bay and take over the freight trains. Running from North bay to Macyard. Or they will run Engleheart to Macyard.
They were even offering large amounts of money to CN engineers to jump ship to ONR.
They haven't started yet as far as I know.
A new siding north of Zephyr is being built north on the cedarbrae crossing, between smith blvd. It's currently under construction. Should be about 13-14k feet
I saw the V4 document and it mostly has do not exceed 60/70 mph until crossings occupied on specific crossings
I don't see any new pso speeds on the Dundas, Strathroy and Kingston (most of it except 1 or 2 closer to Montreal), Montreal and St hyacinthe had like 1 pso added as well...
Yes, the only in service sidings on the Newmarket are Falkenburg, Martins and Trout Creek. Everything else was ripped out or is out of Service. The switcher out of Huntsville works 3 customers 3x per week. Usually the freight out of north bay leaves around mid afternoon.
The high priority oversiding BIT trains usually leave Brampton intermodal around 2-4 am. So that shouldn't conflict. Based on the timings on the business case the northbound would run ahead of the freight run to north bay and the sb would leave north bay 2-3 hr after the nb comes in
The current...
the highest zone speed on the Bala is 70 passenger and 60 freight. While most of the Newmarket is 50 passenger 40 freight. I haven't been on the Kingston in a few years but the highest speeds if i remember correctly are 100/95 passenger and 65 freight. That's a 30 mph difference compared to the...
Yes, it's done by single crew
Yeah Toronto crews will also do the Toronto-North bay run in addition to the Toronto-Capreol run while Capreol crews only do the Toronto-Capreol run + Capreol-Hornepayne
The VIA crews for the Toronto-Capreol segment are based out of Capreol.