Recent content by JoFromTo

  1. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    This may be an odd question but I'll put it out there. Does anyone know of an app that can tell you what you are looking at from your balcony? I see downtown and the island airport and everything in between but beyond downtown I can't tell if I see the Humber shores or Mississauga or who...
  2. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    We are in! 7th floor and we got occupany the second week of May. Aside from the dust and the generally drag with unpacking, we are happy with our suite. We had our own people come in to install an island (the "upgrade" was a $2,500 table) and other cabinet work to maximize the space and that...
  3. J

    Toronto Cliffside Condos | 31.85m | 10s | LCH | RAW Design

    Signs are up on the side of East Haven.
  4. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    Some photos from 14 April 2023.
  5. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    Floor We are on 7 and get ours the week of the 27th
  6. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    Beautiful sunny day yesterday so snapped a few progress photos.
  7. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    Here's some photos from 29 December 2022!
  8. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    Some updates from today.
  9. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    Some pictures as the sun was setting tonight. I never thought we would get good sunsets in the front but I think I am wrong about that!
  10. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    Some pictures from this morning (26 August). The drywall has arrived!
  11. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    Here's a few photos from today!
  12. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    Some photos from today.
  13. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    Some photos from today. They were working on the studs for the interior walls of some of the units and as you can see, a few windows have been put in.
  14. J

    Toronto Merge Condos | 39.32m | 12s | LCH | RAW Design

    Hello, A few pictures from today. Lots of the exterior panels are in place.