News   Jan 16, 2026
 543     0 
News   Jan 16, 2026
 737     0 
News   Jan 16, 2026
 847     1 

Recent content by Aplus23

  1. A

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    well that answers that, thanks
  2. A

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    so what exactly is going on here ? They are currently building the bridgedeck? is that the correct word? Then I'm guessing the abutments are already made and so the bridge will rest on those. Then they remove the temporary structure?
  3. A

    Finch West Line 6 LRT

    well I recently got a new job in the Jane & Finch area & see the lrt being used daily. Looks good to me while driving neway, the stops are much better than the crosstown surface section. Hopefully the line gets better over time with TSP
  4. A

    Sheppard Line 4 Subway Extension (Proposed)

    is that just slow bureaucracy, I mean they know the path, the station stops, they're just extending a line, not building something new
  5. A

    Eglinton East LRT | Metrolinx

    this is what I'd vote for. Scarborough would greatly benefit from this.
  6. A

    Finch West Line 6 LRT

    This is the city's first new transit line and not an extension in like forever no? why don't yall give them some grace? We are asking for trams to interact with traffic (at intersections) in Toronto, this is different from Europe and their policies and their view on transit You guys say in...
  7. A

    Toronto BMO Field Renovations | ?m | ?s | MLSE | Gensler

    can someone point me in the direction of the final renders
  8. A

    Finch West Line 6 LRT

    well TransitThinker posted his video and at the end he reminded everyone who watches that a BRT wouldn't work - (too much busses needed) light Metro - not enough riders Subway - too much money definitely not enough enough riders TSP needs to be implemented, and left turn cars need to go 2nd
  9. A

    Toronto Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    So 2 trains side by side are supposed to fit in that tunnel?
  10. A

    Toronto Ontario Line: Minton Portal + Upper Don Crossings | Metrolinx

    so in 6 months all the piers will be completed?
  11. A

    Toronto Ontario Line: Moss Park Station | 8m | 1s | Metrolinx | HDR

    what's going to happen to the rest of the grounds once the station is built? What's gonna be there ?
  12. A

    Toronto Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    I was anticipating the elevated section would be made how the Davenport elevated section was made, with the machine attached to the form piers and and the pre-cast segment slid into place, seemed like that process was much quicker
  13. A

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    How much of the Go line corridor above ground section accounts for the overall length of the line in KM ? Is the Ex portal outside of the station?
  14. A

    Toronto One Crosstown Towers I, II, III, and The Crest | 129.86m | 39s | Aspen Ridge | Core Architects

    what's going inside the brick podium part of these towers? Apartments or Retail ?
  15. A

    Sheppard Line 4 Subway Extension (Proposed)

    really this line should be extended in both directions in the same shot. It really doesn't make sense to extend the line 7 stops east so it can meet line 2, and not connect it to the other section of line 1 two or three stops away at downsview or Sheppard West

Back
Top