Recent content by 6079 Smith W

  1. 6079 Smith W

    Taylor Creek Park Management Plan

    Someone at the works department must be following this thread, because I noticed today they have begun remediating the section of path washed out by Taylor Creek in the Gatineau Hydro Corridor. Acutally, from the looks of it it appears more as if they are abandoning the washed-out section in...
  2. 6079 Smith W

    East Don Trail Project

    It is great to finally see the progress on the Thunderdome. Having seen it in person I remain stunned at how colossal the structure is. It is of course not terribly useful unless and until its partner tunnel a quarter mile further south is in place, as well as the approaches to the bridge...
  3. 6079 Smith W

    Taylor Creek Park Management Plan

    The (as it was, before the recent construction) underpass at Dawes is an excellent example of how it could/should perhaps be designed for the underpasses at St. Clair and Birchmount and St. Clair and Warden. The latter being what I, an admittedly rather brave cyclist, would describe as a...
  4. 6079 Smith W

    Taylor Creek Park Management Plan

    A small missing link was recently remedied - the bridge over Taylor Creek from a path down from St Clair to the multi-use trail on the north side connecting Birchmount and Warden has finally been replaced and it is a dandy. I pass through on that trail regularly on a cycling route I have...
  5. 6079 Smith W

    East Don Trail Project

    There is also a tunnel a mere 100 metres or so north of the level crossing, making the crossing if not redundant then only a small added convenience for a moderately small number of people.
  6. 6079 Smith W

    East Don Trail Project

    There is incidentally a signalized pedestrian crossing, with lights and barrier arms, over the Metrolinx Stouffville Line, connecting a public school and a high school at Corvette Avenue east of Kennedy Road.
  7. 6079 Smith W

    East Don Trail Project

    I wanted to see it in real life so the other day I climbed down the incredibly steep hill on the Spanbridge side and went to take a look. It really is colossal.
  8. 6079 Smith W

    Taylor Creek Park Management Plan

    here is a bridge repair project over Taylor Creek in the small section north of St. Clair between Birchmount and Warden, which has been stalled for a couple of years but seems to have been recently rejuvenated. The washout happened believe a few years ago, before I became familiar with the area...
  9. 6079 Smith W

    Taylor Creek Park Management Plan

    There are other unrepaired sections further east and north on Taylor Creek: for example along the Gatineau hydro corridor, where the path has collapsed into the creek bed and which has lingered unresolved for many years. As someone pointed out when I mistakenly posted this to an East Don...
  10. 6079 Smith W

    Taylor Creek Park Management Plan

    Here are some shots of the sewer replacement work from the path coming down from Glenwood Crescent
  11. 6079 Smith W

    Taylor Creek Park Management Plan

    Elsewhere in Taylor Creek, there is now another large works underway, in addition to the section between Dawes and Vic Park. The paved trail on the south bank is out of order for a short stretch The "Trail Detour" is not exactly as advertised - the dashed line on the east side is over muddy...
  12. 6079 Smith W

    Taylor Creek Park Management Plan

    I played the Dentonia Park disc golf par 3 yesterday for the first time with my six year old son and we had a blast. It was the first time I have ever set foot on that course, after years of lamenting it as a missing link between two sections of bikeable Taylor Creek paths. The elevation...
  13. 6079 Smith W

    East Don Trail Project

    Fixed. I uploaded the photos and they were on the post, but I guess you have to also click "insert" which I have now done.
  14. 6079 Smith W

    East Don Trail Project

    More good news For the lower section of the East Don Trail. Spotted today: 1. At the southern entrance to the East Don Trail (at the forks): crew consisting of a dumptruck and excavator, smoothing out the temporary abutments to the Bailey bridge over Taylor Creek. This has to mean that plans...
  15. 6079 Smith W

    East Don Trail Project

    Update: Work appears to have resumed at the would-be bridge site. There was a contractor crew with a large number of trucks at the site of the rail crossing this morning. One of the gentlemen stated that they were preparing to drive piles for the bridge abutments.