My observations of the St. Lawrence Market area over the last 7 days.
They are back! Re-work on Wellington St. E. between Church and Scott.
View attachment 676615
View attachment 676616
Hopefully they are done in the tent.
View attachment 676617
Coming to the hood. (Former Tilted Kilt/Shoeless Joe’s on The Esplanade)
View attachment 676618
The good news. The 2 Church St. west half of the Green P parking garage is almost finished but not open yet.
View attachment 676619
View attachment 676620
The bad news; the East half of the Green P parking garage will be closed next. (August start?) The east section was newer pre cast concrete vintage compared to the West half. I wonder how they repair that? I thought it was in good/better shape.
Still a work in progresssssssss outside Metro/Hot House on Wellington. St. E.
Toronto Hydro vault repair taking up a large space now. 1 year or longer? Probably just waiting for an off season shutdown at this point. October is my guess? Thanksgiving?
View attachment 676622
View attachment 676623
Wider sidewalk canopies are overrated. My fair weather dog on Front St. E. One can only walk around Winners for so long.
View attachment 676621
I really should map out and label all these tiles below
The constant 25 year work and rework or new work or make work project from Meridian Hall/Clifford Masonry.
View attachment 676614
View attachment 676624
View attachment 676625
I wonder what their thought process was on replacements?
Why do they need repairs so often? Trucks/E Bikes ? Heaving? Joint failure/drainage/frost? Installation? Dog (or other) urine? High heals? Subway/street car vibration? Earthquakes?
I will try to find a before picture.
I should have applied for the Queens Quay “Neighbourhood inspector” job that was posted a number of years ago to provide daily inspections to remove posters/ minor garbage and report any items back to the City for “action”. Lola might like too.