jer1961
Active Member
Photos taken today, Friday (Dec. 13). A smaller update this week as little has happened in terms of physical progress on the exterior, in sharp contrast to all the court developments! The blue scaffolds on the top and on the corners remain where they were last week, as do the black Rail Climbing Systems (RCSs) installing the skin, with the exception of the smaller one on the south face, which is up to level 48 from 47 last week, now a floor below the three other RCSs. A bit more glass and cladding is now visible on level 50 on the south side.
Starting with view from Yonge and Dundonald to the south, the view from Charles east of Yonge, and a tighter view of the south face and the RCSs and skin there. A wide shot from across the street on Yonge, then the view from Cumberland east of Bay, from Bloor east of Yonge with some interesting light, ditto for from the NE corner of Yonge and Bloor, and a final shot, from Queen's Pk Cres W, north of Hoskin.
www.flickr.com
Starting with view from Yonge and Dundonald to the south, the view from Charles east of Yonge, and a tighter view of the south face and the RCSs and skin there. A wide shot from across the street on Yonge, then the view from Cumberland east of Bay, from Bloor east of Yonge with some interesting light, ditto for from the NE corner of Yonge and Bloor, and a final shot, from Queen's Pk Cres W, north of Hoskin.
One Bloor West (The One) "time-lapse"
From October, 2020, as above-ground construction started in earnest at The One (1 Bloor W.) in Toronto. More or less a weekly photo usually taken on a Friday, with some gaps during early-on construction hiatuses. The initial photographs are from 2015, during demolition at the site, 2018, during...