I’m not sure exactly which part you’re referencing but I think you’re probably seeing some part of the newly constructed temporary retaining walls.In the 5th shot in, are those things sticking out of the embankment the track is on, the old wooden trestle they built when they embankment (so that they could fill it in with soil)?
You can see the retaining walls below whatever is sticking out.I’m not sure exactly which part you’re referencing but I think you’re probably seeing some part of the newly constructed temporary retaining walls.
It was over 30 years ago, to be honest. Though I don't see a lot of changes, as I frequently go through the area.When was this?
I said swankier - not swanky. A hovel is can still be more swankier than a damp mouldy cave.Btw, can you tell me which buildings in Thorncliffe you found to be "swankier" (except for possible "Leaside Towers", in which I know many ppl who have moved out and want to leave because "the buildings are not nice anymore"). Honestly, I can't stop laughing about the "swankier" thing. It's like saying "the South Side seemed swankier than Cabrini Green".
Lakeshore East Joint Corridor Mega-Post (Pt 2/2)
7. Near First AveOld building demolished here, now a staging area and eventually a parkette next to the end of Gerrard Station. Second picture shows the hill I’m standing on for the first picture.8. Gerrard Station from westThe existing west side of the bridge will not be modified. The OL station will be built next to this bridge.9. Gerrard Station from eastThis view may be slightly obstructed by the station, but this whole rail bridge will be untouched since it already carries 4 tracks.10. Near Pape AveNo signs of demo at No Frills yet.11. Gerrard PortalI believe the portal will require demo of most of these residential units here. This is the TBM launch site!12. Langley sewer relocation from southTo accommodate the Ontario Line tunnel, the storm sewer is being relocated using subsurface tunneling under the Pape Ave school property.13. Langley sewer relocation from north
Simple answer is $$$.Still don't understand why they didn't bring this line to Don Mills station at Sheppard. It's 3 more stations all above ground. Bringing it north after that would have been phase 2.