Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

A little more clean-up work happening today. It was interesting to watch them strap all of the remaining cable spools to have the crane lift them all at once. I was a bit concerned they would damage the small column the reels banged into as they were being hoisted.

20231230_143206.jpg
20231230_143354.jpg
20231230_143403.jpg
20231230_143423.jpg
20231230_143457.jpg
 
A little more clean-up work happening today. It was interesting to watch them strap all of the remaining cable spools to have the crane lift them all at once. I was a bit concerned they would damage the small column the reels banged into as they were being hoisted.

View attachment 530380View attachment 530381View attachment 530382View attachment 530383View attachment 530384
Excellent documentation of the little things that we would never see otherwise. Cheers!
 
Thought I'd post some photos to show the progression of the tower during 2023... Three pairs of shots...

First pair - from the NE corner of Yonge and Bloor, taken Jan 6 and Dec 29.

Second pair - from by the old entrance to The Bay, on Bloor, east of Yonge... taken Jan 6 (never published before) and Dec 22.

Third pair, taken from Yonge and Dundas, on Jan 6 and Dec 15.

Back in early January 2023, the forms were at about the level of the first mechanical section, where the Rail Climbing Systems now reside, a year later.

2023 01 06 1 Bloor.jpeg
2023 12 29 1 Bloor.jpeg



UTIMG_1558.jpg
2023 12 22 Bloor by Bay.jpeg
2023 01 06 Yonge St.jpeg
2023 12 08 from Yonge.jpeg
 
Thought I'd post some photos to show the progression of the tower during 2023... Three pairs of shots...

First pair - from the NE corner of Yonge and Bloor, taken Jan 6 and Dec 29.

Second pair - from by the old entrance to The Bay, on Bloor, east of Yonge... taken Jan 6 (never published before) and Dec 22.

Third pair, taken from Yonge and Dundas, on Jan 6 and Dec 15.

Back in early January 2023, the forms were at about the level of the first mechanical section, where the Rail Climbing Systems now reside, a year later.

View attachment 530823View attachment 530822


View attachment 530819View attachment 530821View attachment 530824View attachment 530820
So it's roughly 30+ floors a year........optimistically two more years............they may open the commercial part earlier hopefully.
 
So it's roughly 30+ floors a year........optimistically two more years............they may open the commercial part earlier hopefully.
The rate they are going right now is closer to 50 floors a year. They picked up the speed quite a bit later in 2023.

I expect this will top out early 2025 at the current rate, completion and occupancy likely late 2025 or early 2026.
 