Toronto e2 at ePlace | 156.56m | 46s | Capital Developments | TACT Architecture

Small update from yesterday with a close up of the materials on the podium and balconies.

136695BC-0478-4D90-9440-E9D83BF4CEC7.jpeg
9395EBB4-61A0-4DB1-9971-382C4B837FFA.jpeg


053B6DCD-B1BE-46D0-8361-0F00E84208EA.jpeg
 
if it's any consolation the construction will *finally* wrap up this year. At least until the city comes in to reconstruct the street now that the subway is done.
Thank goodness too. The condition of the road and nearby infrastructure is awful.
 