toronto647
Active Member
The City of Toronto is developing designs for a new pedestrian and cycling bridge over the Canadian Pacific Rail (CPR) corridor to connect the existing Don Mills Trail to the Wynford Drive Extension within the future Crosstown Development at Don Mills Road and Eglinton Avenue East.
Link to city site - https://www.toronto.ca/community-pe...ure-projects/don-mills-crossing-trail-bridge/
This bridge would provide a new multi-use trail connection and access to enjoy the ravine and its natural heritage.
Bridge is anticipated to be completed by 2024
Link to city site - https://www.toronto.ca/community-pe...ure-projects/don-mills-crossing-trail-bridge/
This bridge would provide a new multi-use trail connection and access to enjoy the ravine and its natural heritage.
Bridge is anticipated to be completed by 2024