News   Jun 08, 2023
 178     0 
News   Jun 07, 2023
 2.5K     1 
News   Jun 07, 2023
 1.2K     0 

Toronto Crosstown LRT | ?m | ?s

yrt+viva=1system

Active Member
Member Bio
Joined
Jan 10, 2011
Messages
844
Reaction score
2,943
With those massive platform station name signs, where's the space for advertising (seriously)?
Are they not generating advertising revenue?
Metrolinx tends to keep their stations advertising to a bare minimum. Usually it’s Presto related or from major corporate companies (eg. Banks). Metrolinx’s design and aesthetics has always been business-corporate suite, so there’s no doubt this will be extended to here. The TTC is just the operator.
 

crs1026

Senior Member
Member Bio
Joined
Oct 16, 2014
Messages
8,968
Reaction score
17,059
Why do we need to generate advertising revenue? It is a miniscule amount of money, and makes being in a station a dramatically worse experience.

Any revenue that offsets operating costs is a good thing, IMHO. It’s a question of when is too much.

I like the premise of planning advertising space into the design and building it in suitably…. As opposed to retrofitting it afterwards which inevitably looks junky.

I’m not saying ML has the amount or design right - we won’t know that until opening - but in principle they are doing the right thing.

- Paul
 

JSF-1

Active Member
Member Bio
Joined
Feb 27, 2018
Messages
685
Reaction score
1,540
Location
Woburn
here, maybe?

View attachment 463284

just a guess, but it's not like ads are the most fundamental thing, lots of stations don't have them on the walls, and they're ugly ¯\_(ツ)_/¯
It's impressive the line isn't even open, yet the bare concrete walls are already suffering from water damage. I guess Mount Dennis can get a pass though since it is outside.
 

cplchanb

Senior Member
Member Bio
Joined
Apr 15, 2010
Messages
2,616
Reaction score
1,832
It's impressive the line isn't even open, yet the bare concrete walls are already suffering from water damage. I guess Mount Dennis can get a pass though since it is outside.
typical for structures with poor waterproofing. not surprised for govt jobs where its lowest bidder and value engineering
 

W. K. Lis

Superstar
Member Bio
Joined
Dec 24, 2007
Messages
23,731
Reaction score
14,332
Location
Toronto, ON, CAN, Terra, Sol, Milky Way
When completed, will the Crosstown stations look at least like the completed stations on Line 1?

Shutterstock_12974308a.jpg
From link.

Shutterstock_12974308b.jpg
 

T3G

Active Member
Member Bio
Joined
Jul 10, 2022
Messages
781
Reaction score
1,853
Location
Toronto
typical for structures with poor waterproofing. not surprised for govt jobs where its lowest bidder and value engineering
Being cheap is not something exclusive to governments.

Everyone is afraid of spending a cent more than they need to in this day and age. Governments because they're afraid of backlash from the "taxpayer", and the private sector is equally afraid of compromising shareholder value. The art of spending money to create something of value that lasts appears to have been left behind in the past. Bunch of morons, the whole goddamn lot of them.
 

rickvbiker

New Member
Member Bio
Joined
Aug 9, 2016
Messages
15
Reaction score
11
Who is handling the leasing of retail spaces in the new stations? I thought Gateway but they filed for creditor protection last year. Can't find anything on ttc.ca or MX sites.
 

dullturtle06

Active Member
Member Bio
Joined
Apr 2, 2021
Messages
117
Reaction score
285
Location
Toronto
typical for structures with poor waterproofing. not surprised for govt jobs where its lowest bidder and value engineering
Honestly I think a solution would be to make it a policy that the second lowest bidder is chosen. Then contractor would be more confident putting in a realistic bid. If they just low ball it they won't get it. Makes it easier to be honest.
 

crs1026

Senior Member
Member Bio
Joined
Oct 16, 2014
Messages
8,968
Reaction score
17,059
I can't think of a part of our subway system that doesn't leak. Lots of stations have had those sheet copper overhead gutters installed because of one leak or another.

The question is whether anyone has signed off the acceptance despite the defects observed.

Would we be happy with another delay while a contractor went back and (re)grouted some of those leaks... with further impact on opening day?

I suspect ML will choose to live with a few things.
 

Coolibop

Active Member
Member Bio
Joined
Apr 19, 2022
Messages
173
Reaction score
233
When completed, will the Crosstown stations look at least like the completed stations on Line 1
Queens Park is in a state of repair (they are replacing the tiles), and I'm not sure a fair comparison. Nor did it look like that before with the old tiles.

Also, while I agree the aesthetic isn't great, isn't the water 'stains' running down the wall normal behavior (and not damaged as suggested)? I thought we just didn't bother spending the money to cover up what is typically normal?
 

W. K. Lis

Superstar
Member Bio
Joined
Dec 24, 2007
Messages
23,731
Reaction score
14,332
Location
Toronto, ON, CAN, Terra, Sol, Milky Way
Queens Park is in a state of repair (they are replacing the tiles), and I'm not sure a fair comparison. Nor did it look like that before with the old tiles.

Also, while I agree the aesthetic isn't great, isn't the water 'stains' running down the wall normal behavior (and not damaged as suggested)? I thought we just didn't bother spending the money to cover up what is typically normal?
Shows that people could use the new Crosstown LRT stations while construction continues around them.
 

Top