Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
Saturday morning.
The centre core around crane #3 jump - maybe in progress. It looks like the east side is almost ready too,
67B4B6CF-7DA0-4E57-9489-9AEEBFAEAA31.jpeg


Temporary gas line?
C3B989BF-DADB-41AB-A986-6C8C87E12197.jpeg


E5EE24DB-EFED-4B2F-9ABE-10267A9BBAAE.jpeg


0AD9A834-9342-4774-954E-E0D7B98535A2.jpeg


90F8205C-6167-415E-AE27-31FDA2F170AB.jpeg
 
From this morning and a few from yesterday.

Less crane obstructions from this angle
6D010EBE-DE1B-4DF7-A090-21FAA156898F.jpeg


something wrong with the left phalange.
6B574160-62C7-4B40-8C70-080C4B1DA98C.jpeg


New concrete pump
8629FFCF-C3CF-4B14-95F2-B803596B5EEA.jpeg


New metal decking on the south steel

B037C592-058D-4F42-900A-F2A9B16B869C.jpeg


lots of stuff
14794416-2EC9-4432-9599-5F7213A2744E.jpeg


ADD2199D-E201-4ED3-B635-D8631D0D0228.jpeg


C5F5B99F-AF83-49C9-9711-15DEBB9EFF4F.jpeg


655953B9-F33E-48FF-B37B-C90BD26D3430.jpeg


82DF1CB7-A325-4BC0-BF32-F93BB15DC450.jpeg
 

Attachments

  • 75ABE897-4415-4529-887C-C00C9094273B.jpeg
    75ABE897-4415-4529-887C-C00C9094273B.jpeg
    393.6 KB · Views: 43
  • 5677F840-B897-4204-8555-5BD66500B8D4.jpeg
    5677F840-B897-4204-8555-5BD66500B8D4.jpeg
    287.5 KB · Views: 43
Last edited:
Competition in the building. Maybe I’ll learn a few things.

 

Back
Top