DonValleyRainbow
Senior Member
Member Bio
- Joined
- Mar 5, 2014
- Messages
- 2,867
- Reaction score
- 1,926
- Location
- Kay Gardner Beltline Trail
The full 20 MB presentation is at: http://www1.toronto.ca/City Of Toronto/Strategic Communications/Newsroom/Files/Gardiner_media_presentation.pdf
Here are the 3 Hybrid options - looks like Hybrid 1 is the previous one:
View attachment 64356
Why does option 3 have a separate bridge for the Waterfront Trail over the Don River, whereas the other two do not? Option 3 also eliminates the connection to the Lower Don Trail?