Allandale25
Senior Member
I was told once that 4 tracks to Long Branch would require a new Browns Line Bridge, fairly pricey undertaking. Plus an additional bridge over Etobicoke Creek.
Quad tracks west of Port Credit into Clarkson will require a lot of work and br a tight fit with residential neighbourhoods backing onto the tracks, plus the ravines etc.
West of Clarkson the possibilities of adding a full time fourth track are far more possible, with both the room, and in some places, existing infrastructure that could be reconfigured, revitalized, repurposed.
Signalling upgrades would be called for.
And electrification? Or at least infrastructure where it makes sense as these changes would be made.
Also Bayview. Do you extend these alterations/improvements through to the Bayview Junction (at considerable cost and multiple ownerships) and then around the corner into West Harbour and beyond?
The possibilities are large, the appetitive, well maybe more bite sized?
Add this to the list of things I would rather see than a 401 tunnel




