The last few times I have been down there I have only really seen them working down on the north most section with nothing really going on on the other part
Roadwork and construction on the work/live town houses continues - see updates below. In the article they mention the second part of phase one (back to back town houses) is due to start soon.
Was down at the main beach recently. Work on Spruce Street and Beach Drive continues, with the new road surface narrower than what existed before (maybe one way traffic flow). Work continues on the supporting wall along the beach. There has been steady progress on the work/live condos, mainly on the roof and inside.