News   Apr 24, 2024
 939     1 
News   Apr 24, 2024
 1.3K     1 
News   Apr 24, 2024
 613     0 

Search results

  1. FullMetalEngineer

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Was there last summer too, nice city. Brown's main talking point is the self induced bottleneck of traffic on the surface as they removed 2 lanes to extend sidewalks in the Integrated Downtown Plan. His political agenda is to pacify the downtown groups of businesses and opposing residents from...
  2. FullMetalEngineer

    Brampton Transit/Zum

    I talked to Brampton Transit staff during their public information sessions: There is a Hydrogen Bus Pilot in the works, challenge is sourcing the Hydrogen infrastructure. There is consideration of altering the 505C from Malton GO bus loop and continuing on straight to Airport. They are going...
  3. FullMetalEngineer

    Downtown Brampton Flood Protection Project - Environmental Assessment

    Thanks for sharing the RFP, good to see these diagrams: Riverwalk portion mentioned is for phase 1, there's also phase 2 north of this and a phase 3. Brampton is the only GTA city with a Nimby old guard who control their own media outlet to get their interests back in power and slander...
  4. FullMetalEngineer

    Brampton City Lands Cricket Stadium | ?m | ?s | City of Brampton

    For several years the Blue Jays and Argos shared the SkyDome and exhibition stadium together, would be the closest example I could think of with baseball and football.
  5. FullMetalEngineer

    Brampton Bramrose Square | ?m | 68s | Starbank | Turner Fleischer

    I will never understand the attitude that nothing will be built on Queen when it's already happening right across Brampton and half a dozen new towers have been built already. Sure these fantasy towers may not resemble real life, but all of Queen is going to be intensified in the 2030's...
  6. FullMetalEngineer

    Brampton Bramrose Square | ?m | 68s | Starbank | Turner Fleischer

    Heritage is fine, they expanded to 6 GTA locations with 3 in Brampton.
  7. FullMetalEngineer

    Brampton Bramrose Square | ?m | 68s | Starbank | Turner Fleischer

    68 storeys is the new proposal record in Brampton beating out this 65 storey proposal further east on Queen. I been watching this plaza for decades and it's been primed for a redevelopment. Former businesses like Sears, Kelsey's have been knocked down, fenced off awaiting this day.
  8. FullMetalEngineer

    Brampton Transit/Zum

    Here's a horrible attempt from MiWay at providing shelters on Derry at Malton GO Most of these folks cross the chaos at Derry onto the 14 Torbram to Brampton after a GO Train lets them off at Malton every half hour. The station also has zero sidewalks for them to reach this stop. LIke...
  9. FullMetalEngineer

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    I enjoy arguing over the Brampton side of the LRT, it's been my hobby for almost a decade now as team surface. Any perspective that supports cutting off this extension at Steeles belongs in a fringe minority. The vast majority of experts here and residents in Brampton support the concept of an...
  10. FullMetalEngineer

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Many of us in Brampton want this LRT going further north beyond Bovaird. The studies have been focused on getting it past Queen with the costs and it's also Metrolinx main priority to unify all the west end GO lines together. Once a commitment happens with the recent news , I hope we can begin...
  11. FullMetalEngineer

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    I know a bunch of us want to know if these sudden changes during construction means they can move the stop south of Steeles closer to Gateway Terminal on the north side extension?
  12. FullMetalEngineer

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    2 Brampton Updates: 1) Recent shots of construction for the LRT north end in Brampton just south of Steeles. 2) This Wednesday Brampton council will be proceeding with the $2.8B, 3.8km, 4 stop tunnel route towards TPAP process and continue their advocacy with province/feds. There is no...
  13. FullMetalEngineer

    Brampton Transit/Zum

    Nice to see 4:28am added to Torbram 14. Useful to catch early flights. Airport/Derry has been improved with massive Miway shelters on both sides similar to below. These are being deployed across more intersections on Derry. Now my luggage will stay dry when changing with the 115 Airport Express.
  14. FullMetalEngineer

    Brampton Bramalea Residences | 174.35m | 55s | Lev Living | Kirkor Architects

    Well, let's hope that since the Peel Region split is cancelled, we can get the Queen St Water main/Sewer capacity upgraded which has been delaying many of these developments.
  15. FullMetalEngineer

    Toronto U of T: UTSC Scarborough Academy of Medicine and Integrated Health | 32m | 6s | U of T | MVRDV

    How is this being financed? I see Orlando Corp in Malton is putting up $25M. Are there provincial or Municipal dollars involved here? The city of Brampton had to give away their $50M civic centre that featured the busiest flagship library in the city and arts spaces for free to house TMU...
  16. FullMetalEngineer

    Is Google going the way of Netscape?

    Google has a hold on many of us through Android, Chrome, Maps and Gmail. Sure might use another search engine now and then but they got us locked in to the ecosystem.
  17. FullMetalEngineer

    Brampton Howden Recreation Centre | ?m | ?s | City of Brampton

    Website has been updated and the Estimated project completion is 2026, an extra year of delay. Embleton Recreation Centre out in Brampton West got priority over this facility even though Howden is ready to start construction early next year. Q3 2021: Demolition complete Q4 2021: Soccer field...
  18. FullMetalEngineer

    Brampton Peel Memorial Hospital Phase 2 | 73.14m | 12s | HOK

    Some slides from an October 23, 7pm planning and development committee to modify the bylaw for the Peel Memorial Phase 2 height requirements.
  19. FullMetalEngineer

    Brampton Transit/Zum

    September was a disaster across many routes. I spent the entire month on the phone each week with Brampton Transit and calling up Councillors like Pat Fortini who was oblivious to the situation. Council is being told by Brampton Transit reps that there are no issues. calling in issues and being...
  20. FullMetalEngineer

    Brampton 200 County Court Boulevard | 150.15m | 44s | Stanford Homes | superkül

    The above street level commercial along pedestrian plazas with patio space is the kind of development needed across Brampton. Any independent coffee shop in the city ends up Downtown to die in hopes that it kind of replicates this environment.

Back
Top