Search results

  1. J

    Toronto Amsterdam Towns | 17.68m | 4s | Rise | Guthrie Muscovitch

    Taken today, August 7th, 2023
  2. J

    Toronto 48 Grenoble | 148.4m | 43s | Tenblock | Diamond Schmitt

    Taken today, July 29th, 2023. A protest apparently took place against this redevelopment this afternoon, and was supposedly attended by MPPs and city councillors (No mention of names on the flyer). No news articles concerning the protest so far, and the group's website doesn't have anything new
  3. J

    Toronto Metro Park Condos | 112.7m | 37s | DBS | Kirkor Architects

    Taken today, July 29th, 2023. No crane action so far still, but way more rebar
  4. J

    Toronto Crosstown Community: Generations (Block 5A) | 92m | 27s | Aspen Ridge | a—A

    2nd crane is now up for the same building @interchange42
  5. J

    Toronto One Crosstown Towers I, II, III, and The Crest | 129.86m | 39s | Aspen Ridge | Core Architects

    Taken today, July 28th, 2023. The Crest is now basically topped out, having poured the mechanical penthouse (9th floor) wall forms. The westernmost of the 3 towers now has 5th floor walls poured, with what looks to be 6th floor forms visible
  6. J

    Toronto 770 Don Mills | 153.7m | 48s | CreateTO | Montgomery Sisam

    According to the upcoming meeting information on July 25th (Already published along with the milestone report), both 770 Don Mills and 805 Don Mills are available for market offerings pending provincial Bill 23 funding. 770 Don Mills is still discussing with the school board for the elementary...
  7. J

    Toronto One Crosstown Towers I, II, III, and The Crest | 129.86m | 39s | Aspen Ridge | Core Architects

    Taken today, July 20th, 2023. The Crest is now working on the 9th (Mechanical penthouse) floor, with just the walls and roof of that floor left before it's topped out. The Westernmost of the 3 towers is now on the 5th floor
  8. J

    Toronto One Crosstown Towers I, II, III, and The Crest | 129.86m | 39s | Aspen Ridge | Core Architects

    Taken today, July 13th, 2023. The Crest now has 8th floor wall forms visible (Last floor before mechanical penthouse), and the Westernmost of the taller 3 towers has 4th floor walls already poured
  9. J

    Toronto Crosstown Community: Generations (Block 5A) | 92m | 27s | Aspen Ridge | a—A

    Hard to see, but the crane is now up for this Crosstown Generations 5A building (Behind the Crosstown Place building, which just had its crane taken down) @interchange42
  10. J

    Toronto Crosstown Place | 47.55m | 9s | Metrus | Core Architects

    Crane has now been taken down @interchange42
  11. J

    Toronto Auberge On The Park | 148.9m | 45s | Tridel | Graziani + Corazza

    It was taken pretty late at night, and the latest June 2023 update from Tridel does mention that they're preparing for Summer occupancy. However, it could be that the construction workers left those lights on
  12. J

    Toronto Auberge On The Park | 148.9m | 45s | Tridel | Graziani + Corazza

    Taken today, July 10th, 2023. It looks like the podium units of the eastern and central towers have taken occupancy
  13. J

    Toronto Crosstown Place | 47.55m | 9s | Metrus | Core Architects

    Taken today, July 9th, 2023. The 2nd floor cladding is complete, more cladding is being added to the mechanical penthouse, and 2 of what look like HVAC units have been installed on the roof
  14. J

    Toronto Ellie Condos | 105.76m | 31s | G Group | Kirkor

    Taken today, July 2nd, 2023
  15. J

    Toronto One Crosstown Towers I, II, III, and The Crest | 129.86m | 39s | Aspen Ridge | Core Architects

    Taken today, July 1st, 2023. The Crest now has 8th floor forms visible
  16. J

    Finch West Line 6 LRT

    From the latest Metrolinx Status Report
  17. J

    Toronto Metro Park Condos | 112.7m | 37s | DBS | Kirkor Architects

    It looks like it should be happening soon, the green and black steel box you see next to the people in the first picture is the base, which has to be lowered into that hole after enough rebar has been put there and then concrete needs to be poured into it. Then, a truck will deliver the actual...
  18. J

    Toronto Metro Park Condos | 112.7m | 37s | DBS | Kirkor Architects

    Taken today, June 22nd, 2023
  19. J

    Toronto One Crosstown Towers I, II, III, and The Crest | 129.86m | 39s | Aspen Ridge | Core Architects

    The Crest is now on 7th floor wall forms at the Eastern part, while the Western part is completing 7th floor pours. The Westernmost tower's 4th floor pours seem to be complete as well