  1. kotsy

    Toronto Ontario Line | ?m | ?s

    Appreciate the info, thanks!
  2. kotsy

    Toronto Ontario Line | ?m | ?s

    If overhead power is more expensive and less reliable than why is most of Europeans commuter/high speed rail systems using it? Also, why does it matter that it's uglier? The Ontario Line is half underground/tunneled where you won't even see it and the above ground portions will be in their own...
  3. kotsy

    GO Transit: Construction Projects (Metrolinx, various)

    I have a feeling it will be replaced entirely, as I've seen brand new supports & signals on the Milton corridor.
  4. kotsy

    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    My girlfriend saw the leaves in 5 seconds but I did ask her "what do you see in these buildings?"
  5. kotsy

    Post your pictures of Toronto here!

    This one is certainly better. You would hardly see the eastbound train unless you were on the other side of the bridge. Going lower would help but it's still better to capture a train running on your side.
  6. kotsy

    GO Transit: Construction Projects (Metrolinx, various)

    Part 2 More shots looking East on the new platform. Looking over the fence at the East end of the platform. Looking back Westward from the East end. Looking south to the under construction shift of Eastbound platform (#4) Looking north into Ontario Line construction site. Looking...
  7. kotsy

    GO Transit: Construction Projects (Metrolinx, various)

    Here's another photo dump for Exhibition GO now that the new platform is open. There's clearly nothing more exciting being constructed in my area right now 😂 Starting with the West end of the Eastbound Platform (#1) showing the removed section of the old Westbound tracks. End of Westbound...
  8. kotsy

    GO Transit: Construction Projects (Metrolinx, various)

    And now the rest of the batch You can see how much further East the new platform goes to. The waiting newly built waiting areas on the south side indicates Platform 1 will also be shifting. Alre Already some of the old tracks for platform 4 have been removed.
  9. kotsy

    GO Transit: Construction Projects (Metrolinx, various)

    Went by Exhibition GO again today to see how things are coming along on the relocated track/platform 1. I didn't realize this before but the section at the bottom and West of Atlantic Ave will not have a platform any longer, due to it shifting east 2-300 metres (my best guess). I can't recall...
  10. kotsy

    GO Transit: Construction Projects (Metrolinx, various)

    Work is coming along nice for the new track and platform at Exhibition Station this weekend. Not a trace of the ticket building any longer. You can only really see the old platform from Platform 2(Westbound tracks) No onto the new platform/tracks. All the track seems to be installed. All...
  11. kotsy

    Toronto TD Terrace | 239.87m | 46s | Cadillac Fairview | AS + GG

    Taken just now for you.
  12. kotsy

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    That looks great! I have plans to go tomorrow afternoon but it looks like I'll definitely need to do a night skate too.
  13. kotsy

    TTC Cartography, Signage, and Wayfinding

    This was highly entertaining. Thanks for sharing!
  14. kotsy

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    Couple cell shots from tonight after checking out the Arcadia Earth opening (thanks to @generalcanada for the free ticket hookup!).
  15. kotsy

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    Looks to be about the same size as the one outside Union Station.
  16. kotsy

    GO Transit: Construction Projects (Metrolinx, various)

    Further to my post regarding the new platform opening at Exhibition Station via GO's website.
  17. kotsy

    Toronto Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    The work did emphasize that 1 week is what they claim to be what's happening, meaning he has some doubts, but I don't think it's impossible. Lots of track replacement is done over weekend closures, which means it doesn't need anything close to 3 weeks of testing. In the last photo I posted you...
  18. kotsy

    TTC: Streetcar Network

    They could at least upgrade them when the time comes for replacement.