News   Mar 21, 2023
 1.1K     6 
News   Mar 21, 2023
 697     0 
News   Mar 22, 2023
 1.1K     1 

Search results

  1. M

    Toronto | 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    From your LinkedIn in link.. It wasn’t the last beam but close. Black marker spotted at 239.87m from 800m away.
  2. M

    Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Pictures from Thursday March 14 and Monday March 20. Ready to pour. Work on level 8 now? West face elevation - looking east
  3. M

    Toronto | Sugar Wharf Condominiums (Phase 1) | 231m | 70s | Menkes | a—A

    The two tower drawings are located here. http://app.toronto.ca/AIC/index.do?folderRsn=bt4CyJpsyE%2B6OOTUX37VrQ%3D%3D 100 Queens Quay is 117.34 m tall. You can figure out what angle down and far out in the distance you want to see with an object 60-100m in your way.
  4. M

    Toronto | St Lawrence Market North | 25.3m | 5s | City of Toronto | Rogers Stirk Harbour

    8 exhaust fans(?) lifted to the roof on Sunday. Monday
  5. M

    Toronto | 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    The steel looks almost done.
  6. M

    Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Tim Horton’s run.
  7. M

    Toronto | Sugar Wharf Condominiums (Phase 1) | 231m | 70s | Menkes | a—A

    10 years ago Today Thursday The hoist is still there on the south tower A couple of recent balcony shots
  8. M

    Toronto | Sugar Wharf Condominiums (Phase 2) | 299m | 90s | Menkes | a—A

    They are removing more of the east side than I would have thought. Sorry to mess with you Where is the broom? I like the metal bracing. It was kind-of weird walking the west side of the sidewalk. The east sidewalk is closed for Phase 1 for the most part, Is phase 1 NW tower occupied?
  9. M

    St Lawrence Market

    Things are moving along. Meanwhile over on Scott St….The southern shaft has been completed and the forms removed from site. The south shaft seems shorter than the north shaft but maybe that was due to the street elevation or my counting, I still haven’t figured out how they keep...
  10. M

    Toronto | 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    How many more TD logos can we squeeze in? Will we loose any? From yesterday
  11. M

    Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    From today. from the sky park Yonge st looking west. Working on P2. Just visible from Berczy park I see they added some warning lights.
  12. M

    Toronto | St Lawrence Centre Redevelopment | ?m | ?s | CreateTO | Hariri Pontarini

    I thought the guy from CreateTO at the end was good in wrapping it up with the last few lines.
  13. M

    Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    The crane to building red supports were installed. I guess it takes the same number of people to remove the scaffolding as it does to install it. :)
  14. M

    Toronto | Sugar Wharf Condominiums (Phase 2) | 299m | 90s | Menkes | a—A

    It looks like they only had cooling for the top floor. Temporary Enwave boiler next door.
  15. M

    Toronto | 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    No luck. It should be between Scotia and BMO but still hidden by TD tower. I didn’t check the full window but it looks small. Apple Maps with 160 Front tagged.
  16. M

    Toronto | 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    I’ve never been to Portugal. Can I bring my dog? I might be out this way today. - from yesterday. 11:16 12:35 1:55? Deja vu. Maybe rebalancing the weight and lifting off as one? Last row of black window covering. We’ll give them the top two rows of black and white covering as...

Top